![]() |
* Document 21.2, "Onsite Hazardous Material Packaging and Transportation Safety Manual."
|
* Document 30.1, "Waste Minimization and Pollution Prevention."
|
* Document 32.1, "Managing Discharges to Water and Land."
|
* Document 32.4, 'Discharges to the Sanitary Sewer System."
|
* Document 36.1, "Hazardous, Radioactive, and Biological Waste Management Requirements."
|
3.1.1 DOE/NNSA Review of Beryllium Work Out of the Scope of the CBDPP
|
Appendix B of LLNL Chronic Beryllium Disease Prevention Program (UCRL-AR-144636 Rev. 1.1) lists specific approved operations. New work that is outside the operations listed in the CBDPP must meet the requirements of the ES
|
Under 10 CFR 850, DOE/NNSA Oakland is permitted a 90-day review period, except in cases of emergency response. To allow for an appropriate period of time for review and approval the ES
|
3.2 Exposure Reduction and Minimization Program
|
When exposures as determined without accounting for respiratory protection equal or exceed the AL (see Section 3.3), a formal, operation-specific exposure reduction and minimization program shall be established. This operation-specific program, which is incorporated into the Laboratory's CBDPP and then approved by the DOE, shall include the following:
|
* Annual goals for exposure reduction and minimization.
|
* The rationale for the goals.
|
* Strategies for meeting the goals.
|
* Actions to be taken to achieve the goals.
|
* A means for tracking progress towards meeting the goals and demonstrating that the goals have been met.
|
All times are GMT -6. The time now is 10:55 PM. |
Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2025, vBulletin Solutions, Inc.