View Single Post
Old 02-01-2007, 01:57 PM   #2529
Simplex3 Simplex3 is offline
MVP
 
Simplex3's Avatar
 

Join Date: Sep 2003
Casino cash: $10004900
Upon the completion of spill cleanup, verification of residual contamination is required. The criteria for beryllium work areas (<3 µg Be/100 cm2) and non-beryllium work areas (<0.2 µg Be/100 cm2), as appropriate, shall be met (see Section 3.3 of this document).
Posts: 28,527
Simplex3 would the whole thing.Simplex3 would the whole thing.Simplex3 would the whole thing.Simplex3 would the whole thing.Simplex3 would the whole thing.Simplex3 would the whole thing.Simplex3 would the whole thing.Simplex3 would the whole thing.Simplex3 would the whole thing.Simplex3 would the whole thing.Simplex3 would the whole thing.
    Reply With Quote