|
![]() |
#3046 |
MVP
Join Date: Sep 2003
Casino cash: $10004900
|
3.2 Exposure Reduction and Minimization Program
|
Posts: 28,527
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
![]() |
#3047 |
MVP
Join Date: Sep 2003
Casino cash: $10004900
|
When exposures as determined without accounting for respiratory protection equal or exceed the AL (see Section 3.3), a formal, operation-specific exposure reduction and minimization program shall be established. This operation-specific program, which is incorporated into the Laboratory's CBDPP and then approved by the DOE, shall include the following:
|
Posts: 28,527
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
![]() |
#3048 |
MVP
Join Date: Sep 2003
Casino cash: $10004900
|
* Annual goals for exposure reduction and minimization.
|
Posts: 28,527
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
![]() |
#3049 |
MVP
Join Date: Sep 2003
Casino cash: $10004900
|
* The rationale for the goals.
|
Posts: 28,527
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
![]() |
#3050 |
MVP
Join Date: Sep 2003
Casino cash: $10004900
|
* Strategies for meeting the goals.
|
Posts: 28,527
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
![]() |
#3051 |
MVP
Join Date: Sep 2003
Casino cash: $10004900
|
* Actions to be taken to achieve the goals.
|
Posts: 28,527
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
![]() |
#3052 |
MVP
Join Date: Sep 2003
Casino cash: $10004900
|
* A means for tracking progress towards meeting the goals and demonstrating that the goals have been met.
|
Posts: 28,527
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
![]() |
#3053 |
MVP
Join Date: Sep 2003
Casino cash: $10004900
|
When a formal exposure reduction and minimization program is required, the authorizing organization is responsible for developing the program in concert with the Hazards Control and Health Services Departments.
|
Posts: 28,527
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
![]() |
#3054 |
MVP
Join Date: Sep 2003
Casino cash: $10004900
|
The following sections of this document shall be addressed as part of a formal exposure reduction and minimization program:
|
Posts: 28,527
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
![]() |
#3055 |
MVP
Join Date: Sep 2003
Casino cash: $10004900
|
* Engineering controls (Section 3.4, "Engineering Controls").
|
Posts: 28,527
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
![]() |
#3056 |
MVP
Join Date: Sep 2003
Casino cash: $10004900
|
* Periodic monitoring (Section 3.5.5, "Exposure Monitoring").
|
Posts: 28,527
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
![]() |
#3057 |
MVP
Join Date: Sep 2003
Casino cash: $10004900
|
* Regulated areas (Section 3.5.7, "Beryllium Work Areas and Regulated Beryllium Work Areas").
|
Posts: 28,527
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
![]() |
#3058 |
MVP
Join Date: Sep 2003
Casino cash: $10004900
|
* Warning signs (Section 3.5.8, "Labeling and Posting").
|
Posts: 28,527
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
![]() |
#3059 |
MVP
Join Date: Sep 2003
Casino cash: $10004900
|
* Hygiene facilities and practices (Section 3.7, "Facilities and Equipment").
|
Posts: 28,527
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
![]() |
#3060 |
MVP
Join Date: Sep 2003
Casino cash: $10004900
|
* Respiratory protection (Section 3.6.1, "Respiratory Protection").
|
Posts: 28,527
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
![]() ![]() |
|
|