scho63 |
03-20-2025 08:57 AM |
1 Attachment(s)
New 5 panel solid prehung, interior door for my walk-in bedroom closet arrived from Home Depot and is now lying on the floor in the box taking up more space.
I got rid of a lot of small boxes from all new lights, (9) total plus other things like my 3M whole home water filtration system. but still shit all over in boxes including shelves, my bedframe, desk, my hanging night tables, door handles and everything from my bedroom.
Still have to do a reframe of my utility closet, sheetrock-tape and-knockdown, one entire wall of white oak panels in a unique pattern I designed, paint, do the trim, and then lay down the rug, then do the custom closet.
I have a new LG fridge and LG stackable washer/dryer coming in late April.
I hope to be done by Mid May at the latest. This will have taken 6 months to do everything. Way too long.
When I do the bathroom next, I will have all the items needed stored at the house before the contractor begins and need it done in a week. There will be no shower door or glass door to worry about water marks. All items off the floor so it will be easy to keep clean.
Difficult to do all this while living in a small place. :(
|