Quote:
Originally Posted by Phobia
That's what it is, but I had to cut them into individual strips.
Love your bathroom. I wish somebody would hire me for something like that. Unfortunately that's a pretty high end bathroom. I'll bet it cost triple what this basement did.
|
Okay, that makes sense. When we began remodeling our home four years ago, I wondered how they got the tiles straight. That was until I saw that they were on sheets. But I've seen bad mosaic jobs in spite of them being on sheets (we actually had to have a contractor completely redo a bathroom because it was so freakin' bad. I mean, awful!).
Thanks for the kind words. That bathroom was the toughest bathroom in the house to design. I drew up the plans and picked everything in there, every tile, every accent, every piece of hardware - absolutely everything. It was challenging because I was just
hoping that all of the different tiles and designs would work together.
It took the guys about 8 weeks to complete it (it had already been demo'd two years prior) and I was in there every hour to make sure that they were doing it exactly as specified (especially the lighting - the contractors we've encountered never want to put enough light in these spaces. I learned my lesson the hard way in my kitchen).
Your work looks great and I wouldn't hesitate to hire you if you weren't 2000 miles away!