A surveyors 100' steel tape expands and contracts because of heat and cold temperature. So he has it calibrated at 68F. The surveyors chain has a temperature coefficient of .00000645.
What measurement correction does the surveyor need to make on a 12F day to precisely measure 100' with his calibrated tape?
What correction on a 98F day to measure 100'?
All US survey foot. No SI units.
__________________
"The victim stance is a powerful one. The victim is always morally right, neither responsible nor accountable, and forever entitled to sympathy."
|